What Rotten Roof Sheathing Adds to an Ottawa Roofing Quote
$3 to $6 per square foot
Of sheathing replaced, found at tear-off and billed as an extra, in 2026 Ottawa-area published quotes.
Reviewed 2026-09-30 · how we set these ranges
Sheathing is the layer of boards or panels the roofing is fastened to. Its condition can only be judged once the old roofing is off, which is why quotes carry a separate line for it. The check below helps you guess how much to plan for before tear-off, and what to put in writing.
How much sheathing might this roof need?
Three questions about this job. The answer says which quotes to ask for, not what is wrong with your roof.
Every outcome is listed below; your answers highlight one.
-
Plan for little, get the rate anyway
Nothing points to much replacement, but the rate still belongs in writing before tear-off.
- Repair path
- Sheathing $3 to $6 per sq ft replaced
- Replace path
- $8,000 to $22,000 per typical house, one-layer tear-off
-
Plan for some
Ask the roofer to photograph and count what they replace, so the extra matches the invoice.
- Repair path
- Sheathing $3 to $6 per sq ft replaced
- Replace path
- $8,000 to $22,000 per typical house, one-layer tear-off
-
Ask about structure too
A dip in the roofline or repeated leaks can go past the sheathing. If rafters or trusses need work, the City lists structural repairs among work that needs a permit.
- Repair path
- Sheathing $3 to $6 per sq ft replaced
- Replace path
- $8,000 to $22,000 per typical house, one-layer tear-off
What shows up in the quote
| Line | Published 2026 figure | Ask for |
|---|---|---|
| Sheathing replaced | About $3 to $6 per square foot, as an extra | What counts as rotten, and who decides |
| Proof | Not a price line | Photos and a count of sheets replaced |
| Structural repairs | Too few published Ottawa prices | Whether a permit is needed if rafters are involved |
The rules behind this job
Roofing materials must be installed to the manufacturer's written instructions.
2024 Ontario Building Code, Div. B, 9.26.2.2.Nails or staples penetrate through, or at least 12 mm into, the roof sheathing.
2024 Ontario Building Code, Div. B, 9.26.2.3.If a contract includes an estimate, the supplier cannot charge more than 10% over it.
Consumer Protection Act, 2002, s. 10(1)Structural repairs or alterations need a building permit in Ottawa.
ottawa.ca, building permit projects
Ask before you sign
- The sheathing rate per square foot, in writing, before tear-off
- Photos and a count of what is replaced
- Approval before replacement beyond an agreed amount
- What happens if rafters or trusses are affected
More on this work: Roof Replacement
Quick answers
Why can't the roofer tell me the amount up front?
The sheathing is hidden until the old roofing comes off. That is why the rate, not the total, goes in the contract.
Can the roofer charge more than quoted?
If the contract includes an estimate, the Consumer Protection Act, 2002 caps charges at 10% over it. Put the sheathing rate in writing.
Want this done at your place?